Priority
Priority
Priority

BMT WBM is a specialist Engineering and Environmental consulting firm. Plans to create a new and exciting office space began in September 2009.

At this time the company was spread across 5 floors in a building with a much smaller floor plate.

READ MORE

BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM BMT WBM

Previous locations had been short-listed, and we worked closely with BMT WBM to assist in the selection process by providing detailed design concepts and preliminary costs for two locations they were considering. This information allowed the company to make a quick and informed decision, and led them to selecting Levels 8 and 9 at 200 Creek St in the Brisbane CBD.

Culturally, this was a big move for staff, as they had been in their previous location for over 30 years. The fitout design developed focused on making the layout a better social and functional environment for staff and management. Individuals designed their own work spaces and the end results speak for themselves – a happy and productive workplace.

Project Scope

  • Reception with waiting area
  • 2 x 12-person boardrooms
  • 51 x managers offices
  • Open plan work area
  • 2 x internal meeting rooms
  • Library and compactus storage
  • Staffroom with breakout
  • 2 x kitchenettes
  • Amenities refurbishment & shower facility
Finishes
  • Corian stone bench tops
  • Veneer joinery & custom joinery
  • Recycled hardwood & painted wall paper feature walls
  • Glass splashbacks
  • Crafted copper splashback
  • Feature ceilings & bulkheads
  • Feature tiles & carpet
  • Branded glazed film
  • Australian designed & made laser cut metal planter boxes
  • Custom graphics applied to boardroom tables
Technology
  • Automated drop down projectors
  • Smartboards
  • Touch screen lighting boardroom av control panel
  • Video conferencing

Sustainability Checklist

  • Low Volatile Organic Compound (VOC) paint
  • Extensive natural light with external views
  • Boral Enviroboard – low VOC & 10% recycled material
  • Indoor plants
Materials
  • Workstation board
  • e-veneer
Energy
  • Re-used base building low energy lighting with zoning and sensor controls
  • Re-used existing ac system and zoning system
  • Energy efficient white goods
  • Solar blocking blinds to reduce heat and glare
Water
  • Water efficient tapware, showerheads, urinals and toilets.
Transport
  • End of journey cycling facilities including racks, showers and lockers
  • Easy access to existing public transport

Project Details

BMT WBM – Office Fitout

Levels 8 & 9, 200 Creek St, Brisbane CBD
Total floor area: 1800m2

PROJECT SCHEDULE

Town Planning: 18 weeks
Design: 14 weeks
Construction: 12 weeks

PROJECT TEAM

Project Manager: Peter Lewis
Project Administrator: Dean Robertson

Priority